BTS Park Mostki

Mostki
Location
2 100 m2
Surface
2022.07
Start of construction
2023.03
Construction finished

The project is located in the municipality of Lubrza in the Świebodzin district, 14 km from the S3 and 14.3 km from the A2.

The project includes the construction of a staff hotel with a total net area of 2 100 m2.

Location

Distance from:
Wrocław
240 km
Szczecin
180 km
Warszawa
430 km
Berlin
160 km
S3
15 km
A2
20 km
Airport
40 km
Mapa lokalizacji inwestycji BTS Mostki z zaznaczoną bliskością granicy polsko-niemieckiej (Berlin 120 km)
Scroll

Technical specifications

Total area 2 100 m²
Reinforced concrete + steel construction
LED lighting
Fire alarm system
Gas heating
Air conditioning
Condensing reactive energy system
Access control
CCTV monitoring
Parking for passenger vehicles
Photovoltaic installation
Electric vehicle charging station
Natural green

Rzut obiektu

Facility plan