BTS Park Świebodzin

Start of construction: 2020.02
Construction finished: 2020.08
Świebodzin
Location
6 100 m2
Surface

The project is located in the southern part of Świebodzin, 3 km from the S3 and 12 km from the A2.

The project involves the construction of a hall with a total net area of 6 000 m2.
The area of the hall is 4 700 m2, with an office and staff area of 1 300 m2.

The net height of the hall is 6,60 m.

Location

Distance from:
Wrocław
220 km
Gdańsk
415 km
Szczecin
170 km
Warszawa
420 km
Wrocław
225 km
Berlin
180 km
S3
3 km
A2
10 km
Airport
30 km
Scroll

Technical specifications

Pole spacing 23.05 x 18.00 m
Net height 8,50 m
Total area 6 000 m², production and warehouse hall 4 700 m², office 1 300 m²
Reinforced concrete construction
Natural lighting - skylights
LED lighting
Fire alarm system
Non-dusty industrial floor with a load capacity of 50 kN/m²
Gas heating
Destrifiers
Condensing reactive energy system
7 hydraulically adjustable docks
6 "ZERO" gates
Access control
CCTV monitoring
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Natural green

Rzut obiektu

Facility plan