BTS Park Ĺwiebodzin
Start of construction: 2021.02
Construction finished: 2022.03
Ĺwiebodzin
Location
7 300 m2
Surface
The project is located in the southern part of Ĺwiebodzin, 3 km from the S3 and 12 km from the A2.
The project involves the construction of a hall with a total net area of 7 300 m2.
The floor area of the hall is 6 300 m2, with an office and staff area of 1 000 m2.
The net height of the hall is 8,50 m.

Location
Distance from:
WrocĹaw
220 km
GdaĹsk
415 km
Szczecin
170 km
Warszawa
420 km
WrocĹaw
225 km
Berlin
180 km
S3
3 km
A2
10 km
Airport
30 km


Scroll
Technical specifications
Pole spacing 21.50 x 12.00 m
Net height 8.50 m
Total area 7 300 m², production and warehouse hall 6 300 m², office 1 000 m²
Reinforced concrete construction
Natural lighting - skylights
LED lighting
Fire alarm system
Non-dusty industrial floor with a load capacity of 50 kN/m²
Gas heating
Destrifiers
Condensing reactive energy system
8 hydraulically adjustable docks
1 "ZERO" door
Access control
CCTV monitoring
Air conditioning (office)
Instalacja LAN (biuro)
Parking for cars and trucks
Natural green
Rzut obiektu
Facility plan