BTS Park Mostki
Start of construction: 2020.10
Construction finished: 2021.08
Mostki
Location
1 600 m2
Surface
The project is located in the southern part of Åšwiebodzin, 3 km from the S3 and 12 km from the A2.
The project involves the construction of a hall with a total net area of 1 600 m2.
The area of the hall is 1 200 m2, the office-social area is 400 m2.
The net height of the hall is 8,70 m (workshop), 4,60 m (office).

Location
Distance from:
Wrocław
240 km
Gdańsk
415 km
Szczecin
180 km
Warszawa
430 km
Wrocław
225 km
Berlin
160 km
S3
15 km
A2
20 km
Airport
40 km


Scroll
Technical specifications
Pole spacing, every 6 m in one direction
Net height 8.72 m (hall), 4.62 m (office)
Total area 1 600 m², production and warehouse hall 1 200 m², office 400 m²
Steel construction
Natural lighting - skylights
LED lighting
Fire alarm system
Non-dusty industrial floor with a load capacity of 50 kN/m²
Photovoltaic installation
Gas heating
Condensing reactive energy system
10 crossing gates
Access control
CCTV monitoring
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Naturalna zieleń
Rzut obiektu
Facility plan