BTS Park Gorzów Wlkp.
Gorzów Wlkp.
Location
20 500 m2
Surface
Q1 2026
Start of construction
Q4 2026
Construction finished
The project borders on the agglomeration of Gorzów Wlkp. at a distance of 30 km from the S3.
The project involves the construction of a production and warehouse hall with a total area of 20 500 m2, which can be divided into 4 modules.
Each module has an area ranging from 2 650 m2 to 7 850 m2.
The height of the production and warehouse hall is 10 m.

Location
Distance from:
Poznań
170 km
Szczecin
125 km
Warszawa
470 km
Berlin
120 km
S3
30 km
A2
65 km
Airport
140 km


Scroll
Technical specifications
Pole spacing 12,00 x 24,00 m
Height 10 m
Minimum module area 2650 m²
Reinforced concrete construction
Skylights
LED lighting
BMS building management system
Fire alarm system
Sprinkler system
Industrial floor, non-dusting with a carrying capacity of 50 kN/m²
Photovoltaic installation with energy storage
Gas heating
Air distributor
Condensing reactive energy system
Hydraulically controlled docks (1 dock per 500 m²)
Gates from the ‘ZERO’ level
Maximum fire load Q<1000 MJ/m²
Access control
Monitoring CCTV
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Electric vehicle charging station
Natural green
Rzut obiektu
Facility plan
