BTS Park Gorzów Wlkp.

Start of construction: Q1 2026
Construction finished: Q4 2026
Gorzów Wlkp.
Location
20 500 m2
Surface

The project borders on the agglomeration of Gorzów Wlkp. at a distance of 30 km from the S3.

The project involves the construction of a production and warehouse hall with a total area of 20 500 m2, which can be divided into 4 modules.

Each module has an area ranging from 2 650 m2 to 7 850 m2.

The height of the production and warehouse hall is 10 m.

Location

Odległość od:
Wrocław
165 km
Gdańsk
455 km
Szczecin
215 km
Warszawa
455 km
Wrocław
190 km
Berlin
245 km
S3
15,7 km
A2
56 km
Airport
41,6 km
Scroll

Technical specifications

Pole spacing 12,00 x 24,00 m
Height 10 m
Minimum module area 2650 m²
Reinforced concrete construction
Skylights
LED lighting
BMS building management system
Fire alarm system
Sprinkler system
Industrial floor, non-dusting with a carrying capacity of 65 kN/m²
Photovoltaic installation with energy storage
Gas heating
Air distributor
Condensing reactive energy system
Hydraulically controlled docks (1 dock per 500 m²)
Gates from the ‘ZERO’ level
Maximum fire load Q<1000 MJ/m²
Access control
Monitoring CCTV
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Electric vehicle charging station
Natural green

Rzut obiektu

Facility plan