BTS Park Świebodzin

Start of construction: Q2 2025
Construction finished: Q1 2026
Świebodzin
Location
24 000 m2
Surface

The investment is located in the southern part of Świebodzin, 3 km from the S3 motorway and 10 km from the A2 motorway.

The project involves the construction of a production and warehouse hall with a total net area of 24 000 m2, which can be divided into 6 modules.

Each module has an area of 3 360 m2 to 5 820 m2.

The height of the hall is 10 metres.

Location

Distance from:
Wrocław
220 km
Gdańsk
415 km
Szczecin
170 km
Warszawa
420 km
Wrocław
225 km
Berlin
180 km
S3
3 km
A2
10 km
Airport
30 km
Scroll

Technical specifications

Pole spacing 12,00 x 24,00 m
Height 10 m
Minimum module area 3 360 m²
Reinforced concrete construction
Skylights
LED lighting
BMS building management system
Fire alarm system
Sprinkler system
Industrial floor, non-dusting with a carrying capacity of 65 kN/m²
Photovoltaic installation with energy storage
Gas heating
Air distributor
Condensing reactive energy system
Hydraulically controlled docks (1 dock per 500 m²)
Gates with level "ZERO"
Maximum fire load Q<1000 MJ/m²
Access control
Monitoring CCTV
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Electric vehicle charging station
Natural green

Rzut obiektu

Facility plan