BTS Park PoznaƄ West

Start of construction: Q3 2025
Construction finished: Q2 2026
PoznaƄ
Location
23 400 m2
Surface

The investment is located in the Dopiewo municipality in the PoznaƄ agglomeration, 5 km from the S11 motorway and 7 km from the A2 motorway.

The project involves the construction of a production and warehouse hall with a total net area of 23 400 m2, which can be divided into 8 modules.

Each module has an area of 2 925 m2.

The height of the production and warehouse hall is 10 metres.

Location

Distance from:
WrocƂaw
130 km
GdaƄsk
325 km
Szczecin
250 km
Warszawa
320 km
WrocƂaw
170 km
Berlin
280 km
S11
5 km
A2
7 km
Airport
15 km
Scroll

Technical specifications

Pole spacing 22.50 x 12.00 m
Height 10 m
Minimum module area 2 925 mÂČ
Reinforced concrete construction
Skylights
LED lighting
BMS building management system
Fire alarm system
Sprinkler system
Industrial floor, non-dusting with a carrying capacity of 65 kN/mÂČ
Photovoltaic installation with energy storage
Gas heating
Air distributor
Condensing reactive energy system
Hydraulically controlled docks (1 dock per 500 mÂČ)
Gates from the ‘ZERO’ level
Maximum fire load Q<1000 MJ/mÂČ
Access control
Monitoring CCTV
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Electric vehicle charging station
Natural green

Rzut obiektu

Facility plan