BTS Park Zielona Góra
Start of construction: Q2 2025
Construction finished: Q1 2026
Zielona Góra
Location
10 000 m2
Surface
The investment is located in the Zielona Góra agglomeration, 15 km from the S3 motorway.
The project involves the construction of a production and warehouse hall with a total area of 10 000 m2, which can be divided into 4 modules.
Each module has an area ranging from 850 m2 to 3 330 m2.
The height of the production and warehouse hall is 10 m.

Location
Odległość od:
Wrocław
160 km
Gdańsk
455 km
Szczecin
210 km
Warszawa
450 km
Wrocław
190 km
Berlin
240 km
S3
15 km
A2
50 km
Airport
40 km


Scroll
Technical specifications
Pole spacing 12,00 x 24,00 m
Height 10 m
Minimum module area 850 m²
Reinforced concrete construction
Skylights
LED lighting
BMS building management system
Fire alarm system
Sprinkler system
Industrial floor, non-dusting with a carrying capacity of 65 kN/m²
Photovoltaic installation with energy storage
Gas heating
Air distributor
Condensing reactive energy system
Hydraulically controlled docks (1 dock per 500 m²)
Gates from the ‘ZERO’ level
Maximum fire load Q<1000 MJ/m²
Access control
Monitoring CCTV
Air conditioning (office)
LAN installation (office)
Parking for cars and trucks
Electric vehicle charging station
Natural green
Rzut obiektu
Facility plan
